Waste Not

The smoke rings, which will be formed through the condensation of water in the flue gases, will be lit at night by lasers and heat tracking technology.

Amagerforbraending will feature almost a mile of ski runs.

The smokestack and incinerator of the waste-to-energy plant will be hidden within.

The plant will puff smoke rings that are 98 feet in diameter whenever 1 ton of fossil carbon dioxide is released.

The slope will be made of recycled synthetic granular material

The structure will be wrapped in a vertical facade formed by planter modules stacked like bricks.

Inside, plans include office space and daylit circulation spaces.

Various sustainable strategies are included in Amagerforbraending.

Join the Discussion

Please read our Content Guidelines before posting

Close X