Posted on:

Ames Hall

Quinn Evans Architects

Shared By



2025 Foxhall Road


The George Washington University


  • Mechanical Engineer: Summer Consultants
  • Structural Engineer: McMullan Associates
  • Protection Engineering Group
  • Civil Engineer: AMT LLC

Project Status


Year Completed



55,713 sq. feet

Construction Cost


Certifications and Designations

View all (9) images

Project Description

Ames Hall is the first visible building upon entering the main gates of the Mount Vernon Campus of The George Washington University. Quinn Evans Architects renovated an existing historic building and designed an addition which doubles its size. The solution is artfully composed within the confines of the tight and steeply sloped site, and complements this academic building within the context of the traditional campus while providing much needed additional office/administrative, classrooms, lecture halls, and student auxiliary spaces. The south façade of Ames stands as an inviting entry point into the campus while maintaining its historic position on the Quad to the north.
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X