Project

Posted on:

Bronx Lebanon Life Recovery Center

Shared By

Press

Location

1276 Fulton Avenue


Bronx,

NY


10456

Client/Owner

Bronx Lebanon Hospital

Consultants

  • Structural Engineer: Hage Engineering
  • Geotechnical Engineer: Pillori Associates
  • General Contractor: Procida

Project Status

Built

Year Completed

2013

Size

60,000 sq. feet

Construction Cost

$20,000,000
View all (8) images

Project Description

The project is a 60,000-sf residential and outpatient treatment facility for Bronx-Lebanon Hospital Center on a corner site that is directly across from the main hospital facility of their Fulton Division. This new five-story building houses several outpatient programs specializing in the treatment of people in substance-abuse recovery. In addition to the outpatient programs, there will be three floors of residential programs for up to 100 residents.

The design intention is two-fold: to create a welcoming residential setting for outpatients and staff, while simultaneously communicating a professional service-delivery system. Funding for this project was provided by NYS OASAS, with project management by the New York State Dormitory Authority (DASNY).

WASA/Studio A’s M/E/P Engineering group was also responsible for site storm-water drainage systems, which include catch basins, catch-basin sumps and storm-water detention tanks required for regulatory compliance.
Advertisement
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X