Project

Posted on:

Cairo International Airport Terminal-3

GMW MIMARLIK

Shared By

GMWMimarlik, GMW MIMARLIK


Project Name

Cairo International Airport Terminal-3

Project Status

Built

Year Completed

2008

Client/Owner

TAV


ARCHITECT



Style

Modern

Project Description

In 2007, GMW MIMARLIK was appointed to provide full architectural design services by the Design and Build Contractors responsible for the construction of the new 11 million pax Terminal 3 at Cairo International Airport. Planned on three full and three mezzanine floors, the terminal building is connected to a 3-storey pier structure, which provides 22 boarding lounges, two of which have been adapted to serve the new generation airbus A380. The project also includes an apron control tower and a 3-storey bridge structure spanning between Terminals 2 and 3.

The original project designed by NACO (Holland) and ECG (Egypt) has been developed to comply with the up to date international design standards, operational requirements, and the regulations for acoustics and earthquake resistance. The interior design has also been adapted to provide a contemporary airport environment equipped with the most advanced technologies and airport systems.

Client: TAV
Use: International Passenger Terminal
Gross floor area: 200,200 sqm
Completion: Spring 2008

Advertisement
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X