Project

Posted on:

Chanhassen High School

Shared By

Marin

Location

2200 Lyman Boulevard


Chanhassen,

MN


55317

Project Status

Built

Year Completed

2010

Size

405,000 sq. feet
View all (3) images

Project Description

Minnesota's 405,000 sq. foot high school designed by Perkins + Will (formerly Rozeboom Miller Architects) opened September 2009.

Complete with a new football stadium, 2 practice fields, 8 tennis courts, 650-seat theater, and open cafeteria, the $93 million campus also features 4 wings or "houses" allowing students to focus on core classes with one set of instructors for a two-year period.

The architect envisioned a warm, real-wood ceiling for Chanhassen's new high school. "We wanted to create a feeling of warmth, of an inviting atmosphere," Principal Paul McMahan told the Victoria Town Square, "We wanted to create something that reminded people more of a college campus building than a high school and I think we achieved that."

Hunter Douglas' aluminum linear Box 4 metal ceiling system, profile-wrapped with real-wood veneer, was chosen to capture the warmth and aesthetics of real wood while utilizing an economical system, with the long-lasting stability of metal and the low-impact environmental aspects of highly recycled content aluminum and wood flitches.


The use of warm wood tones, abundance of natural daylight and new fixtures throughout make Chanhassen's newest high school a good example of successful school design.
Advertisement
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X