George Gardner Performing Arts Center

SPS+ Architects - Carlos A Murrieta, AIA

Shared By

Carlos M

Location

North 8th Avenue


Holbrook High School


Holbrook,

AZ


86025

Client/Owner

Holbrook Unified School District

Consultants

  • Civil Engineer: GHD
  • General Contractor: Lake Powell Construction
  • Mechanical Engineer: RJ Ghan Engineers
  • Plumbing Engineer: RJ Ghan Engineers
  • Electrical Engineer: Electrical Design Consultants, Inc.
  • Structural Engineer: EM Plummer
  • Landscape Architect: The Campbell Collaborative

Project Status

Built

Year Completed

2008

Size

27,566 sq. feet

Construction Cost

$7,456,000
View all (13) images

Project Description

The George Gardner Performing Arts Center was the finalization of a 30 year planning process for the Holbrook Unified School District and the Community of Holbrook. After a bond election process held in November 2005, the District was granted with 4.5 million dollars to start the construction of this facility. The School District and the community coordinated a fund rising campaign to a final budget of 7.5 million for the construction of the building. The facility has a full fly loft with a 50’-0” wide proscenium and orchestra pit, with a seating capacity of 809 in 27,000 S.F. The auditorium was designed with careful review of the natural acoustics in it’s shape and materials selection to provide excellent natural acoustics throughout the house.
Advertisement
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X