Marina Bay Sands Integrated Resort

Safdie Architects

Shared By




Marina Bay Sands (Las Vegas Sands Corp.)


  • Aedas
  • Structural Engineer: Arup
  • Arup
  • Arup
  • Civil Engineer: Arup
  • Geotechnical Engineer: Arup
  • Mechanical Engineer: Vanderweil Engineers; Parsons Brinckerhoff
  • Electrical Engineer: Vanderweil Engineers; Parsons Brinckerhoff
  • Plumbing Engineer: Vanderweil Engineers; Parsons Brinckerhoff
  • Landscape Architect: Peter Walker and Partners Landscape Architecture; Peridian International
  • Project Lighting Design
  • Safdie Architects with the Rockwell Group
  • Interior Designer: CL3 Architects; Hirsch Bedner Associates
  • Fisher Dachs Associates
  • HFA International
  • Construction Manager: Ssangyong Engineering & Construction Co.
  • General Contractor: Ssangyong Engineering & Construction Co.
  • James Carpenter, Antony Gormley with Tristan Simmons,


9,000,000 sq. feet

Construction Cost

View all (12) images

Project Description

The Marina Bay Sands Restort, in Singapore, is easily noticed by its three 55-story towers overlooking Marina Bay. The sloping geometry of the towers required the structural engineers at Arup, particularly the bridge and tall-building specialists, to devise a strut-and-tension-cable system to support the walls during construction.A low-rise, undulating podium in front of the towers houses a vast array of entertainment venues. Because of space constraints, Safdie built the three-acre SkyPark, 656 feet in the air, by bridging the tops of all three towers at the 55th story. 9,000 silver-painted, metal-composite panels enclose these mega trusses.

Read the full article:
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X