Project

Posted on:

Polk County National Guard Readiness Center

THA Architecture and Lease Krutcher Lewis

Shared By

Xululabs

Size

40,000 sq. feet

Project Description

When preparing the RFP for a new Dallas, Ore., readiness center for the Oregon National Guard’s 162nd Combat Engineering Company, Col. Christian F. Rees—trained as an architect himself—called not for a utilitarian structure, but for design excellence. The design/build team of THA Architecture and Lease Krutcher Lewis responded with a three-volume, 40,000-square-foot complex that includes an armory, classrooms, offices, and a large drill space, as well as public areas such as a central hall that the surrounding community can access when the Guard isn’t using the facility. The architects specified local materials such as basalt-filled gabion walls and FSC-certified western red cedar to “not only tie the building to place, but to represent the work of the guard, specifically this engineering unit,” says THA design principal David Keltner, AIA. The center is slated to open in August 2012.
Advertisement
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X