Posted on:

Severna Park High School

GWWO, Inc./Architects

Shared By



60 Robinson Road



Anne Arundel County Public Schools


  • Other: Acoustical Design Collaborative
  • Other: Advanced Building Performance, Inc.
  • Other: Educational Systems Planning
  • Structural Engineer: Faisant Associates, Inc.
  • Mechanical Engineer: Gipe Associates, Inc.
  • Electrical Engineer: Gipe Associates, Inc.
  • Plumbing Engineer: Gipe Associates, Inc.
  • Civil Engineer: KCI Technologies, Inc.
  • Other: Nyikos Associates, Inc.
  • Geotechnical Engineer: Kimble, Inc.

Year Completed



366,780 sq. feet

Construction Cost

View all (7) images

Project Description

The new 366,780-SF Severna Park High School is comprised of a multistory building with a variety of single story elements. The school building components form an open courtyard at the core, share two entrance lobbies, and are linked by passage corridors. In addition to the new building, a separated bus loop, parent drop-off area and parking facilities will also be included. The design is based on a feasibility study GWWO completed for the high school in 2011.

The new building will be constructed in a single phase on the grounds of the existing Severna Park High School, while the existing school remains fully operational. After construction, the existing facility will be demolished, and new athletic fields will be constructed in its place. The school is being designed to meet a minimum of LEED Silver Certification.
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X