Project

Posted on:

Tropicana Casino Renovations

SOSH Architects

Shared By

Regina, SOSH Architects


Project Name

Tropicana Casino Renovations

Location

Tropicana Casino & Resort


2831 Boardwalk




08401

Project Status

Built

Year Completed

2015

Size

55,200 sq. feet

Client/Owner

Tropicana Entertainment


Team

  • William A. Salerno, AIA, PP
  • Vince DeGennaro
  • Michael Salerno, AIA
  • Michael Mangini

Consultants

  • General Contractor: Massett Building
  • Mechanical Engineer: Giovanetti Shulman Associates
  • Electrical Engineer: Giovanetti Shulman Associates
  • Plumbing Engineer: Giovanetti Shulman Associates
  • Lighting Designer: Illuminating Concepts


View all (5) images

Project Description

Last renovated in the 1980s, the North Tower section of Tropicana’s casino floor was outdated and underused. The SOSH team was tasked with transforming the aging space into a timeless gaming atmosphere to showcase Tropicana’s advanced gaming product while embracing the Cuban flavor of The Quarter. Adding to the design challenge was the need to seamlessly integrate an existing sports bar. The SOSH team set the stage for a fresh new gaming floor experience by delivering a sophisticated design, a new high limit zone, and a pedestrian pathway that visually guides visitors from The Quarter to the North Tower casino. Havana-inspired colors, textures and other visual cues were woven into the design, creating a lively and engaging place to play and be entertained.
Advertisement
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X