Posted on:

Washington Station, New Class "A" Office Building

QPK Design LLP

Shared By



333 West Washington Street





Pioneer Companies


  • Mechanical Engineer: Argus Engineering
  • Electrical Engineer: Argus Engineering
  • Plumbing Engineer: Argus Engineering
  • Structural Engineer: Palucci Engineering, PC
  • Construction Manager: Pioneer Companies

Project Status


Year Completed



128,000 sq. feet

Construction Cost


Certifications and Designations

View all (11) images

Project Description

A new mixed-use office/retail facility in Downtown Syracuse's Armory Square district. This 6-story office building was constructed using a structural steel frame with concrete floors. The building's exterior is a light gauge metal and rain screen system that incorporates a combination of metal and terra cotta panels and a glass curtain wall. The building program also included 45 on-grade outdoor parking spaces. Tenant finishes included full height mahogany doors, parabolic lighting and a combination of floating and suspended ceiling systems. In addition, an under floor duct system facilitates the distribution of data, telephone and electrical services.

Through the use of advanced engineering and energy management technology, the planned building uses far less energy and water than comparable buildings. The project achieved LEED Silver Certification.

Site development included urban design, parking design, planting design for an extensive "green" roof garden, and stormwater management on a tight urban site.
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X