Project Detail

 

Bronx Lebanon Life Recovery Center

Bronx, NY United States

 

Project Description

The project is a 60,000-sf residential and outpatient treatment facility for Bronx-Lebanon Hospital Center on a corner site that is directly across from the main hospital facility of their Fulton Division. This new five-story building houses several outpatient programs specializing in the treatment of people in substance-abuse recovery. In addition to the outpatient programs, there will be three floors of residential programs for up to 100 residents.

The design intention is two-fold: to create a welcoming residential setting for outpatients and staff, while simultaneously communicating a professional service-delivery system. Funding for this project was provided by NYS OASAS, with project management by the New York State Dormitory Authority (DASNY).

WASA/Studio A’s M/E/P Engineering group was also responsible for site storm-water drainage systems, which include catch basins, catch-basin sumps and storm-water detention tanks required for regulatory compliance.

 

Project Details

Bronx Lebanon Life Recovery Center
Location:
Shared by:
 
Client/Owner:
Project Team:
    Jack Esterson AIA, Partner in Charge; Stan Fabiszak, Project Manager; Julius Gangel, Subhas Chanda, Galina Prokofyeva & Alexander Rempel, M/E/P Engineers
Consultants:
  • Structural Engineer: Hage Engineering 
  • Geotechnical Engineer: Pillori Associates 
  • General Contractor: Procida 
 
Project Type:
Project Status:
Year Completed:
Project Size:
    60,000 sq ft
Construction Cost:
    $20,000,000
Tags:
 
 
 

Comments

Please read our Content Guidelines before posting.

Similar Projects

 

Other Mid-Atlantic Projects