Project Detail

 

Brooklyn Bridge Park Pier 6

New York, NY United States

Bjarke Ingels Group (BIG)

 

Project Description

FROM THE ARCHITECTS:

BIG+MVVA have unveiled their design for Pier 6 of Brooklyn Bridge Park, a public space and pavilion in form of a massive wood-clad triangular viewing platform for events and skyline gazing.

BIG’s proposal for Brooklyn Bridge Park, a project that has revitalized the New York City waterfront, consists of a 6,000 ft2 (560 m2) triangular cross-laminated timber structure, serving both as pavilion and platform. Sloping upwards 17.5 feet (5.3 m) in height from the foot of the large gathering lawn, the platform provides magnificent views of the surrounding harbor, the Statue of Liberty, the Manhattan skyline, and the Brooklyn Bridge. In conjunction with the adjacent greenery, Pier 6 will be dominated by a flower field and treed areas giving the area seasonal displays of color.

The surface of terraced stairs, softly illuminated, will allow for large and small events and is fully ADA accessible. The pavilion, supported by thin steel columns, is brightly lit with up-lights and provides shade, shelter and space for indoor activities. Movable site furniture underneath the platform will accommodate a variety of programs, from food carts and picnicking to community events and small performances.

Bjarke Ingels comments: “The Mantaray is a small public platform at the end of the pier - equally accessible above and below. Its namesake organic slopes and curves have been shaped by concerns for accessibility, safety, shelter, structure - like a manmade reef evolved to accommodate human life.”

“This spectacular structure will provide much-needed shade and a unique space for public events, while offering a dramatic ascent to the water’s edge,” said Regina Myer, President of Brooklyn Bridge Park. “We are so pleased with the collaboration between Michael Van Valkenburgh’s landscape design for the southern portion of the park, and Bjarke Ingels’ design for a breathtaking architectural addition that provides a truly special moment on the waterfront.”

BIG was selected as winner of the project in Spring 2013. The collaboration between MVVA and BIG has evolved into a fruitful partnership where pavilion and landscape design inform and inspire each other. The project won the unanimous approval of the Community Board’s executive committee, as well as from the city’s Public Design Commission.

For more information, please visit http://big.dk/#projects-bbp

 

Project Details

Brooklyn Bridge Park Pier 6
Location:
Shared by:
 
Project Team:
    Bjarke Ingels (creative director); Thomas Christoffersen (partner-in-charge); Iannis Kandyliaris (project leader); Martin Voelkle (project manager); Ho Kyung Lee, David Spittler, Dennis Harvey, Isshin Morimoto (project team)
Consultants:
  • Landscape Architect: MVVA 
  • Structural Engineer: Knippers Helbig 
  • Lighting Designer: Tilotson Design Associates 
  • Mechanical Engineer: AltieriSeborWieber 
  • Electrical Engineer: AltieriSeborWieber 
  • Plumbing Engineer: AltieriSeborWieber 
  • Code Consultant: Pantocraft 
  • Expediter: Formactiv 
 
Project Scope:
Project Type:
Project Status:
Project Size:
    6,000 sq ft
Tags:
 
 
 

Comments

Please read our Content Guidelines before posting.

Similar Projects

 

Other Mid-Atlantic Projects