Project Detail

 

Children’s Chapel and Education Center

Brookline, MA United States

 

Project Description

Brian Healy Architects • To celebrate its 50th anniversary jubilee in 2003, the Korean Church of Boston held a design competition. The brief: Design an infill structure on the church’s existing site for the congregation’s smallest members, children aged five through 12. Brian Healy Architects won the competition with a scheme for a two-story (plus basement) structure with a CMU-and-steel frame, clad in a wood-and-cement-panel rainscreen—a modern structure that is a far cry from its traditional New England surroundings. But instead of being an affront, the changes to the campus actually invite the neighborhood in, with a series of site and landscaping changes that excavated an existing plinth and retaining wall down to grade level, creating a public park for the community.

The 8,341 square feet of new construction and 2,133 square feet of renovated space include classrooms, a community hall, a fellowship hall, and a children’s chapel. The chapel—which juror Bill Valentine “liked spatially—features a faceted ceiling clad in acoustic panels. A CNC-fabricated bamboo screen allows people to enter the space without disrupting the proceedings and echoes the warmth of the wooden riser seating. The altar doubles as a stage area, so that the children can put on performances for their parents and the rest of the parishioners. Donna Robertson appreciated the woodwork, and although juror John Cary expressed some concern about the juxtaposition of the modern and traditional designs, he thought the project as a whole was “very, very nice.”

 

Project Details

Children’s Chapel and Education Center
Location:
Shared by:
 
Client/Owner:
Project Team:
    Brian Healy, principal; Paxton Sheldahl, associate; Heike Baraungardt; Gerry Gutierrez; Tala Klinck; Bohseung Kung; Steve Mayer; John McDonald; Chris Muskoft; Matt Pierce; Tom Rourke; Alec Templeton;
Consultants:
  • Structural Engineer: Richmond So Engineers 
  • Lighting Designer: Lam Partners 
  • Acoustics: Threshold Acoustic Engineers 
  • Electrical Engineer: Allied Consulting Engineering Services 
  • Mechanical Engineer: Allied Consulting Engineering Services 
  • Plumbing Engineer: Allied Consulting Engineering Services 
  • Civil Engineer: BSC Group 
  • Fabrication Engineer: Bill Bancroft 
  • General Contractor: Kang Suk Construction 
 
Project Type:
Project Status:
Project Size:
    10,474 sq ft
 
 
 

Comments

Please read our Content Guidelines before posting.

Similar Projects

 

Other New England Projects