Project Detail

 

Detroit Public Safety Headquarters

Detroit, MI United States

SmithGroupJJR

 

Project Description

onverting a casino into a public safety administration building requires some imagination. More than 90,000 square feet of insulated metal panels from Metl-Span® assisted with the transition and helped the Detroit Public Safety Headquarters become the city’s first facility to achieve LEED®-certified status.

The building, originally an office for the Internal Revenue Service, was left abandoned twice – once by the IRS and a second time by MGM Casino, which purchased the facility to be used as a temporary casino until its new building was completed. The City of Detroit purchased the building and began refurbishing in the spring of 2012. It now houses offices for the city’s police and fire administrative personnel, the Michigan State Police Metropolitan Forensic Laboratory, the city’s Building Authority office, Homeland Security office and Information Technology Services Group.

 

Project Details

Detroit Public Safety Headquarters
Location:
Shared by:
 
Client/Owner:
Firm Name:
Consultants:
  • General Contractor: CEI Group LLC of Howell 
 
Project Scope:
Project Type:
Project Status:
Year Completed:
Project Size:
    400,000 sq ft
Construction Cost:
    $65,000,000
Green Certifications:
 
 

Specified Products

Metl-Span 2" CF24 Panel

51,000 square feet of horizontal 2-inch CFA panels in widths of 40, 36 and 32 inches and just more than 40,000 square feet of vertical 2-inch CFA panels in widths of 36 and 24 inches. The horizontal panels were all custom Submarine Gray, while the vertical panels were manufactured in three colors: custom Key Largo, Tarryton and Sweet Nothings.

 
 

Comments

Please read our Content Guidelines before posting.

Other Government Projects

 

Other Great Lakes Projects