(Already have an account? Log in)

Registration

Not sure? Read the benefits of registration.

Need help registering? Send us an email!

Create a new account with ARCHITECT!

* Required fields
 
 
OR

Register using your Social Network:

 
 

Project Detail

 

George Gardner Performing Arts Center

Holbrook, AZ United States

SPS+ Architects - Carlos A Murrieta, AIA

 

Project Description

The George Gardner Performing Arts Center was the finalization of a 30 year planning process for the Holbrook Unified School District and the Community of Holbrook. After a bond election process held in November 2005, the District was granted with 4.5 million dollars to start the construction of this facility. The School District and the community coordinated a fund rising campaign to a final budget of 7.5 million for the construction of the building. The facility has a full fly loft with a 50’-0” wide proscenium and orchestra pit, with a seating capacity of 809 in 27,000 S.F. The auditorium was designed with careful review of the natural acoustics in it’s shape and materials selection to provide excellent natural acoustics throughout the house.

 

Project Details

George Gardner Performing Arts Center
Location:
Shared by:
 
Project Team:
    Terry Worcester, Architect of Record, Carlos A Murrieta, Design Architect/PM, Jeremy Bloomer, Job Captain, Douglas Strom, Team
Consultants:
  • Civil Engineer: GHD 
  • General Contractor: Lake Powell Construction 
  • Mechanical Engineer: RJ Ghan Engineers 
  • Plumbing Engineer: RJ Ghan Engineers 
  • Electrical Engineer: Electrical Design Consultants, Inc. 
  • Structural Engineer: EM Plummer 
  • Landscape Architect: The Campbell Collaborative 
 
Project Type:
Project Status:
Year Completed:
Project Size:
    27,566 sq ft
Construction Cost:
    $7,456,000
 
 
 

Comments

Please read our Content Guidelines before posting.

Similar Projects