Project Detail

 

Gloria Marshall Elementary School

Houston, TX United States

SHW Group, LLP

 

Project Description

What initially began as a “repeat” school design resulted in one of the greenest elementary schools in the state of Texas without adding any costs to the district’s capital budget. When the architect and Spring Independent School District first began exploring the goals for the new school, conversations quickly turned to daylighting, energy efficiency and water conservation. This led to an original sustainable, high-performance school designed as a teaching tool that will educate generations of students about resource conservation. The school was designed to achieve LEED Gold certification and has already been accepted by the U.S. Environmental Protection Agency (EPA) to receive an ENERGY STAR rating due to its energy-efficient building design. In addition, the architect designed the school to meet criteria for Collaborative for High Performance Schools (CHPS), the nation’s first green building rating program especially designed for K-12 schools. The building will also be the first school in Houston to use geothermal heating and cooling, which is expected to save at least 25 percent in energy consumption over the current code. Once complete, the school will be a two-story rectangular building oriented with long sides facing north and south. Each classroom will have natural light and the south-facing classrooms will take advantage of daylight harvesting. In addition, the building was designed to have lights off in the classrooms 75 percent of the time, so each room will have sensors that turns the lights on and off based on levels of natural light.

 

Project Details

Gloria Marshall Elementary School
Location:
Shared by:
 
Firm Name:
Project Team:
    Mark Lam, AIA, LEED AP; Tracy Eich, AIA, LEED AP; Luis Ayala, Associate AIA, LEED AP, Jody Henry, LEED AP; Eddie Blanco, AIA; Anata Patel; Amanda Erb, IIDA, LEED AP
Consultants:
  • General Contractor: Purcell Construction 
  • Structural Engineer: SHW Group 
  • Mechanical Engineer: CMTA Engineering 
  • Civil Engineer: LJA Engineering & Surveying 
  • Geothermal: Loop Tech 
  • Acoustic: BAI 
 
Project Type:
Project Status:
Year Completed:
Project Size:
    105,391 sq ft
Green Certifications:
 
 
 

Comments

Please read our Content Guidelines before posting.

Other Education Projects

 

Other West South Central Projects