Ithaca College Athletics and Events Center

Ithaca, NY United States

Moody Nolan

 

Project Description

Anchoring the eastern edge of a small campus, this 179,000 sq. ft. multipurpose facility works with the existing hillside topography and creates a visual termination for a major pedestrian walkway. The large mass is set into the ground to reduce the project scale and accentuate the tower – now an iconic element for the college. Tucking the building into the hillside minimized impact on nearby wetlands, woods and residential neighbors.

The program for this facility focused on three main activity places: indoor field house, natatorium and outdoor turf field. As the primary indoor facility for Ithaca College, the field house needed to accommodate varsity practice and competition, intramural and club sports, and the basic recreational needs of students. The main hall at the center of the building (also used as a pre-function event space) is the main gathering space and central control point for the building.

Of particular interest, this collegiate athletics and events center, like the student athletes it serves, draws its life from natural “breathing.” The signature design element, the tower, serves as a natural ventilator powered by the stack effect of warm air rising and expelling hot air out the top of the tower with minimal mechanical means, while drawing cooler air into the building through louvers low on the prevailing wind side of the building. Mechanical systems are not needed when the temperatures are within a set temperature range. In climatic extremes an underground displacement heating and cooling system needs to condition only the lower 15 feet of the space.

 

Project Details

Ithaca College Athletics and Events Center
Location:
Shared by:
 
Client/Owner:
Firm Name:
Project Team:
    Curtis J. Moody, Principal-in-Charge of Design; Troy Sherrard, Project Design Manager; Howard Blaisdell, Project Manager; Milan Moncol, Project Architect; Jim Durbin, Project Archtect; Janet Hines, Interior Designer; Kylie Stanley, Graphic Designer; Tim Traber, Virtual Environment Team Designer; Andrea Quinones, Virtual Envirtonment Team Designer; Arthur Cox, Construction Administrator
Consultants:
  • Structural Engineer: Korda Nemeth Engineering 
  • Mechanical Engineer: Korda Nemeth Engineering 
  • Electrical Engineer: Korda Nemeth Engineering 
  • Plumbing Engineer: Korda Nemeth Engineering 
  • Landscape Architect: MKSK 
  • Aquatics Designer: Counsilman Hunsaker 
  • Civil Engineer: T. G. Miller 
 
Project Type:
Project Status:
Year Completed:
Project Size:
    179,000 sq ft
Construction Cost:
    $55,000,000
 
 
 