Project Detail

 

One Madison Park

New York, NY United States

CetraRuddy

 

Project Description

CetraRuddy • Like a diagram of what a tall building should be, One Madison Park rises 620 feet in a single stroke: a stack of glazed boxes cantilevered off of a black spine. Retail space, a lobby, and high-end amenities, such as a spa and media room, fill the base of the lean 51-floor residential tower. Located on the southeast corner of Madison Square Park, just a block away from another iconic skyscraper, the historic Flatiron Building, CetraRuddy’s design won over the jury with its striking form. “It’s just a minimal gesture that has maximal effect,” remarked Donna Robertson.

The building’s skinny 12:1 proportion is the result of purchasing air rights for the narrow site. By applying a strategic approach to the structural system—interior reinforced concrete shear walls and a rooftop slosh tank mitigate any lateral movement—the architects were able to free up the exterior curtain walls so that each of the 71 luxury apartments comes with a sweeping view of Manhattan.

 

Project Details

One Madison Park
Location:
Shared by:
 
Client/Owner:
Firm Name:
Project Team:
    John Cetra, design principal; Keith Goich, project architect; Ceacy Cook, project manager;
Consultants:
  • Interior Designer: Thomas Juul-Hansen 
  • Construction Manager: Bovis Lend Lease 
  • Structural Engineer: WSP Cantor Seinuk 
  • Civil Engineer: Langan Engineering & Environmental Services 
  • Electrical Engineer: MG Engineering 
  • Mechanical Engineer: MG Engineering 
  • Plumbing Engineer: MG Engineering 
  • Curtain-Wall Consultant: Israel Berger & Associates 
  • Curtain-Wall Subcontractor: W&W Glass 
  • Hoist & Scaffold: Atlantic Hoisting & Scaffolding 
  • Demolition: Contractor Breeze National 
  • Foundation Subcontractor (Phase 1): Civetta Cousins 
  • Concrete Subcontractor: Century-Maxim Construction Corp. 
  • Mechanical Subcontractor: Epic Mechanical Contractors 
  • Sprinkler Subcontractor: Federated Fire Protection 
  • Electrical Subcontractor: Five Star Electric Corp. 
  • Elevator Subcontractor: Fujitec America 
  • Caisson Subcontractor (Phase 1): Hayward Baker Geotechnical Construction 
  • Plumbing Subcontractor: Pace Plumbing Corp. 
  • Tile & Marble Subcontractor: Port Morris Tile & Marble Corp. 
  • Drywall Subcontractor: R&J Construction 
  • Vertical Netting Subcontractor: Universal Building Supply 
 
Project Type:
Project Status:
Project Size:
    180,431 sq ft
Construction Cost:
    $130,812,475
 
 
 