Project Detail

 

The Bow, EnCana and Cenovus Headquarters

Calgary, Alberta Canada

Foster + Partners

 

Project Description

FROM THE ARCHITECTS:

Special events have been held in Calgary this week to mark the official opening of The Bow, a 237-metre-high headquarters tower – the city’s tallest building and Canada’s tallest tower outside Toronto. A bold new landmark on the skyline, the project is equally significant in urban, social and environmental terms: the public base of the tower is filled with shops, restaurants and cafes and extends into a generous landscaped plaza, while the office floors are punctuated by three six-storey sky gardens, which encourage natural ventilation and help to significantly reduce energy use.

The Bow is the first major development on the east side of Centre Street, a major axis through downtown Calgary, and it provides a shared headquarters for Encana and Cenovus. The building’s form was shaped by analysis of the climate and organisations. The tower faces south, curving towards the sun to take advantage of daylight and heat, while maximising the perimeter for cellular offices with views of the Rocky Mountains. By turning the convex facade into the prevailing wind, the structural loading is minimised, thus reducing the amount of steel required for the inherently efficient diagrid system. Each triangulated section of the structure spans six storeys, helping to visually break down the

scale of the building.

Where the building curves inwards, the glazed facade is pulled forward to create a series of atria that run the full height of the tower. These spaces act as climatic buffer zones, insulating the building and helping to significantly reduce energy consumption. As each floor plate has been sized to accommodate a whole business unit, there was a need to promote collaboration across the companies and bring a social dimension to the office spaces. Vertical access to the office floors is therefore directed through three spectacular sky gardens, which project into the atria at levels 24, 42 and 54 and incorporate mature trees, seating, meeting rooms, catering facilities and local lift cores. Staff facilities in these atria are complemented by an auditorium at the very top of the building.

 

Project Details

The Bow, EnCana and Cenovus Headquarters
Location:
Shared by:
 
Firm Name:
Project Team:
    Norman Foster, David Nelson, Spencer de Grey, Nigel Dancey, James Barnes, Julia Vidal Alvarez, Laura Alvey, Tim Bauerfeind, Jakob Beer, Karin Bergmann, Mattias Bertelmann, Stephen Best, Federico Bixio, Marie Christoffersen, Vasco Correia, Kirsten Davis, Ulrich Hamman, Michelle Johnson. Arjun Kaicker. Sabine Kellerhoff. Chiu-Ming Benny Lee, Mathieu Le Sueur, Shirley Shee Ying Leung, Alissa MacInnes, Carsten Mundle, Florian Oelschlager, Cristina Perez, Susanne Reiher, Diana Schaffrannek, Anja Sc
Consultants:
  • Developer: Matthews Southwest Developments 
  • Collaborating Architect: Zeidler Partnership 
  • Structural Engineer: Yolles 
  • Civil Engineer: Kellam Berg 
  • Mechanical Engineer: Cosentini Associates 
  • General Contractor: Ledcor Construction 
  • Fire Consultant: Leber Rubes 
  • Vertical Transport Consultant: KJA 
  • Acoustic Consultant: Cerami 
  • Lighting Designer: Claude Engle Lighting Design 
  • Landscape Architect: Carson McCulloch 
  • Planning Consultant: Sturgess Architecture 
  • Environmental Consultant: Transolar 
  • Wind Engineer: RWDI 
  • Transportation Engineer: DA Watt 
  • Signage Consultant: Cygnus 
  • Code Consultants: Leber-Rubes 
  • Art Consultant: Via Partnership 
  • Artist: Jaume Plensa 
  • Cladding: Brook Van Dalen 
 
Project Scope:
Project Type:
Project Status:
Year Completed:
Project Size:
    199,781 sq m
 
 
 

Comments

Please read our Content Guidelines before posting.

Other Commercial Projects

 

Other Canada Projects