Launch Slideshow

A completed home in Yucca Valley, Calif., built using the Blue Sky Frame, a light-gauge, pregalvanized steel moment-frame system.

The Blue Sky Frame

The Blue Sky Frame

  • A completed home in Yucca Valley, Calif., built using the Blue Sky Frame, a light-gauge, pregalvanized steel moment-frame system.

    http://www.architectmagazine.com/Images/tmp2DB7%2Etmp_tcm20-863843.jpg

    true

    A completed home in Yucca Valley, Calif., built using the Blue Sky Frame, a light-gauge, pregalvanized steel moment-frame system.

    600

    David A. Lee

    A completed home in Yucca Valley, Calif., built using the Blue Sky Frame, a light-gauge, pregalvanized steel moment-frame system.

  • The bare site for the Blue Sky Frame structure.

    http://www.architectmagazine.com/Images/tmp2DB6%2Etmp_tcm20-863842.jpg

    true

    The bare site for the Blue Sky Frame structure.

    600

    The bare site for the Blue Sky Frame structure.

  • The frame is lightweight enough to be assembled with minimal machinery and a small construction crew.

    http://www.architectmagazine.com/Images/tmp2DB3%2Etmp_tcm20-863839.jpg

    true

    The frame is lightweight enough to be assembled with minimal machinery and a small construction crew.

    600

    The frame is lightweight enough to be assembled with minimal machinery and a small construction crew.

  • Because it connects to structural concrete footings, it is minimally invasive to the landscape.

    http://www.architectmagazine.com/Images/tmp2DB4%2Etmp_tcm20-863840.jpg

    true

    Because it connects to structural concrete footings, it is minimally invasive to the landscape.

    600

    Because it connects to structural concrete footings, it is minimally invasive to the landscape.

  • The pregalvanized components are delivered and assembled without special equipment or tools.

    http://www.architectmagazine.com/Images/tmp2DB5%2Etmp_tcm20-863841.jpg

    true

    The pregalvanized components are delivered and assembled without special equipment or tools.

    600

    The pregalvanized components are delivered and assembled without special equipment or tools.

  • The completed structure will be a 1,000-square-foot house.

    http://www.architectmagazine.com/Images/tmp2DB9%2Etmp_tcm20-863845.jpg

    true

    The completed structure will be a 1,000-square-foot house.

    600

    The completed structure will be a 1,000-square-foot house.

  • The entire structure can be nearly completed enclosure in as few as three days.

    http://www.architectmagazine.com/Images/tmp2DB2%2Etmp_tcm20-863838.jpg

    true

    The entire structure can be nearly completed enclosure in as few as three days.

    600

    The entire structure can be nearly completed enclosure in as few as three days.

Motivated by the desire to build a house on a rugged site in Southern California’s high desert, marketing executive David McAdam discovered a company that had devised a lightweight framing system for industrial applications—a point-loaded, bidirectional, moment-resisting frame made not of structural steel, but primarily of cold-formed, light-gauge, galvanized steel. McAdam worked with the manufacturer, a structural engineer, and an architect to modify the system for his house. The application proved so successful that McAdam solicited partners and formed Blue Sky Building Systems to market the frame for general residential use in 2010. Fifteen more projects have now been completed or are under development.

Manufactured with up to 70 percent recycled content, the Blue Sky Frame is shaped, cut, drilled, detailed, and labeled in a factory. Then it is shipped flat to the jobsite, where it is quickly bolted to peripheral columns made of structural tube steel. No welding is required, because the system is assembled using a specialized eight-bolt connection. “In my world of small buildings and residential architecture, there doesn’t seem to be much innovation from companies in terms of trying to extend their products,” juror William Massie says. But “this is a big extension.” Massie also praised the system’s pregalvanized option, noting that galvanizing a frame is usually a separate step that costs time and money.

With the Blue Sky system, a 1,000-square-foot house can be built in six to eight weeks. And given the absence of load-bearing walls, it is easy to achieve interior spaces with spans of up to 40 feet. There are eco-benefits are well: Since the system anchors only to a series of small footings, there is no need for intrusive site grading, which means minimal damage to the land. Factory prefabrication also minimizes site waste. “Architectural history, particularly in fabricated houses, is littered with great ideas,” juror Sylvia Smith says. “I thought this was very clean.”