Waste Not

Waste Not

Waste Not

The smoke rings, which will be formed through the condensation of water in the flue gases, will be lit at night by lasers and heat tracking technology.

Waste Not

Amagerforbraending will feature almost a mile of ski runs.

Waste Not

The smokestack and incinerator of the waste-to-energy plant will be hidden within.

Waste Not

The plant will puff smoke rings that are 98 feet in diameter whenever 1 ton of fossil carbon dioxide is released.

Waste Not

The slope will be made of recycled synthetic granular material

Waste Not

The structure will be wrapped in a vertical facade formed by planter modules stacked like bricks.

Waste Not

Inside, plans include office space and daylit circulation spaces.

Waste Not

Various sustainable strategies are included in Amagerforbraending.

Close X