Ng Teng Fong General Hospital & Jurong Community Hospital

HOK, CPG, Studio 505



Project Name

Ng Teng Fong General Hospital & Jurong Community Hospital

Location

Project Status

Built

Year Completed

2015

Size

1,962,853 sq. feet

Construction Cost

$371,500,000

Consultants

  • Structural Engineer: CPG Consultants
  • Other: HOK
  • Other: ZEB Technology
  • Mechanical Engineer: Parsons-Brinkerhoff
  • Landscape Architect: Peridian Schematic, Zhu Yi architectural & landscape design office
  • Interior Designer: Bent Severin and Associates




View all (9) images

Project Description

From the AIA:
The Green Mark Platinum NTFGH is part of Singapore’s first medical campus to combine continuing care from outpatient to post-acute care. Based on passive principles, the performance-based design supports resource efficiency, health, and well-being. Seventy percent of the facility is naturally ventilated, representing 82% of inpatient beds. Unlike its Singaporean peers, NTFGH provides every patient with an adjacent operable window, offering daylight and views. An oasis in a dense city, NTFGH incorporates parks, green roofs and vertical plantings throughout the campus. The building uses 38% less energy than a typical Singaporean hospital and 69% less than a typical U.S. hospital.

2017 AIA COTE Top Ten Jury Comments:
This project was able to achieve net zero energy in a project type that typically does not achieve this level of performance. This a community college science building containing teaching labs with specialized ventilation needs. In achieving net zero energy, this project saved a significant amount of money over a regular building, providing a model for others to replicate. The project's design maximized a holistic range of energy reduction strategies, including a high performance envelope, daylighting, and innovative ventilation strategies.

BY THE NUMBERS:
Estimated carbon emissions: 97.5lbs CO₂ / sq.ft.
Predicted net carbon emissions: 19.5
Predicted lighting power density (watts per square-foot): 0.74 watts/sq.ft.
Percentage of floor area or occupant work stations within 30 ft. of operable windows: 70%
Predicted percent reduction from National Average EUI for Building Type: 38%
Advertisement
Add a Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X