Project Details
- Project Name
- The Atrium
- Client/Owner
- Jawl Investment Corporation
- Size
- 20,000 sq. meters
- Year Completed
- 2010
- Shared by
- D'Ambrosio architecture + urbanism
- Consultants
-
null: Hirschfield Williams Timmins, Avalon Mechanical Consultants,Electrical Engineer: Applied Engineering Solutions Inc.,Civil Engineer: Bullock Baur & Associates,Geotechnical Engineer: CN Ryzuk & Associates,Wakefield Acoustics Ltd.,JD Dunsmore & Associates Inc.,GHL Consultants Ltd.,Advicas Group Consultants Inc.,Landscape Architect: Murdoch de Greeff Inc.,Bill Porteous Studio,(skylight structure) StructureCraft in collaboration with DAU
- Certifications & Designations
- LEED Gold
- Project Status
- Built
- Cost
- $50,000,000
Project Description
Located on a one-acre site in downtown Victoria, British Columbia, Canada, the Atrium Building comprises approximately 20 000 square metres of class A office and retail space spread across seven levels, with two levels of underground parking. Its design holds aesthetic distinction, user comfort, and civic responsibility as its guiding principles. The seven-storey form is clad in pre-cast concrete panels, zinc, and glass. The proportions and façade-scaled detail responds to the historic context of Victoria’s downtown. The street-level retail and orientation of the atrium and office entries serve the specific use patterns of the site. The project has achieved a LEED Gold rating based in part through the use of passive energy saving and daylighting strategies made possible by the incorporation of an internal atrium. Green roof technology, street-edge rain gardens, and a high-efficiency envelope also contribute to the environmentally sustainable design.