Project Details
- Project Name
- Youth Center
- Location
-
548 Shipping Street NE
Salem ,United States
- Client/Owner
- Salem Alliance Church
- Project Types
- Religious
- Project Scope
- Renovation/Remodel
- Size
- 2,700 sq. feet
- Year Completed
- 2011
- Awards
- 2014 AIA - Local Awards
- Shared by
- CB Two Architects, LLC
- Project Status
- Built
- Cost
- $200,000
Project Description
Salem Alliance Church needed a fresh, flexible space for its youth center. They were using an adapted auto repair shop for middle school and high school activities. The 2,700-sf space had been remodeled several times and was a labyrinth of rooms and exit corridors. In addition to significant exiting issues, the space was bisected by a large structural CMU wall. Located in a quiet residential neighborhood, the exterior needed to attract youth without detracting from the craftsman style homes from the 20’s & 30’s.
To open up a column-free entrance area, a significant 30” deep steel beam replaced a large portion of the CMU wall. Existing glu-lam beams were exposed and refinished. Intumescent paint allowed all steel structure to be exposed. Carpet was removed, revealing years of character in the concrete floor which became the finished surface. Corrugated steel was used to clad the opposing walls of the snack bar and main entrance. This material was contrasted with maple veneer paneling used to highlight signature spaces. Bold greens and reds lend the space contemporary vibrancy. Custom designed interchangeable furniture allows users the ability to adapt the space for various activities.
A new canopy covers the remodeled entry where large frosted glass windows provide privacy while still allowing natural light. The building was downplayed on the exterior, only the building address and two small custom light fixtures give any indication of what’s inside.
The entire project from initial solicitation to completion took only 3 months and construction was kept under $250,000.