NYC School Construction Authority: Mott Haven Campus

NYC School Construction Authority: Mott Haven Campus

  • Entrance stairs

    http://www.architectmagazine.com/Images/tmp1E0C%2Etmp_tcm20-979447.jpg

    Entrance stairs

    600

    Chris Cooper

    Entrance stairs

  • Aerial view of shared performaing arts building and adjacent sports field

    http://www.architectmagazine.com/Images/tmp1E0B%2Etmp_tcm20-979439.jpg

    Aerial view of shared performaing arts building and adjacent sports field

    600

    Chris Cooper

    Aerial view of shared performaing arts building and adjacent sports field

  • Image

    http://www.architectmagazine.com/Images/tmp1E10%2Etmp_tcm20-979475.jpg

    Image

    600

    Courtesy Perkins Eastman

  • Cellar-level plan

    http://www.architectmagazine.com/Images/tmp1E11%2Etmp_tcm20-979488.jpg

    Cellar-level plan

    600

    Courtesy Perkins Eastman

    Cellar-level plan

  • Basement-level plan

    http://www.architectmagazine.com/Images/tmp1E12%2Etmp_tcm20-979492.jpg

    Basement-level plan

    600

    Courtesy Perkins Eastman

    Basement-level plan

  • First-floor plan

    http://www.architectmagazine.com/Images/tmp1E13%2Etmp_tcm20-979504.jpg

    First-floor plan

    600

    Courtesy Perkins Eastman

    First-floor plan

  • Second-floor plan

    http://www.architectmagazine.com/Images/tmp1E14%2Etmp_tcm20-979507.jpg

    Second-floor plan

    600

    Courtesy Perkins Eastman

    Second-floor plan

  • Auditorium lobby

    http://www.architectmagazine.com/Images/tmp1E0E%2Etmp_tcm20-979462.jpg

    Auditorium lobby

    600

    Chris Cooper

    Auditorium lobby

  • Theater

    http://www.architectmagazine.com/Images/tmp1E0F%2Etmp_tcm20-979471.jpg

    Theater

    600

    Chris Cooper

    Theater

Category: Grow
Honorable Mention

In New York, space is always at a premium. So when faced with high demand for classrooms, the New York City Department of Education turned to an old rail yard—17 to 30 feet below grade—for additional space. Perkins Eastman designed the $137 million Mott Haven Campus to accommodate four distinct schools on the brownfield site, clustered around a shared 600-seat performing arts space and sports field. Each school (all of which have grades 9–12, and one of which also has K–4 students) has its own identity, with a separate color scheme, entry, classrooms, and dining facilities.

The jury lauded the campus for creating a sense of place for the students, especially in light of “all the issues that come up with being in that kind of densely compacted area,” said juror Ted Landsmark, who also noted that projects like the Mott Haven Campus can create incentive for public authorities to follow the example. “Urbanistically it does some good things,” juror Raymund Ryan said. “it creates a kind of haven inside with this shared space.”


Project Credits

NYC School Construction Authority: Mott Haven Campus, Bronx, N.Y.
Client  New York City School Construction Authority
Architect  Perkins Eastman, New York—Aaron Schwarz, FAIA (principal-in-charge); Perry Nunez, Christine Schlendorf (project managers); Ernesto Vela, Joseph Iannucci, Melissa Schroeder, Kate Hanenberg (design team)
Associate Architect  Alexander Gorlin Architects—Alexander Gorlin, FAIA
M/E/P Engineers  WSP Flack + Kurtz—Sheldon M. Steiner (senior vice president)
Structural Engineer  Leslie E. Robertson Associates—Rick Zottola (partner)
Civil Engineer  Langan Engineering and Environmental Services—Alan Poeppel (senior associate)
Landscape Architect  RGR Landscape—Geoffrey Roesch (principal)
Food Service  Romano Gatland Food Service Consultants—John LaBarbera
Theater Acoustics  Harvey Marshall Berling Associates—Todd Berling (principal consultant)
General Contractor  The DeMatteis Organization
Size  286,651 square feet
Cost  $157.82 million (including site work)
Photograph  Chris Cooper