Project Details
- Project Name
- Boulevard Brewing Company Cellar 1 Expansion
- Location
-
MO ,United States
- Architect
- El Dorado
- Client/Owner
- Boulevard Brewing Company
- Project Types
- Industrial
- Size
- 2,000 sq. feet
- Year Completed
- 2012
- Shared by
-
Editor,hanley wood, llc
- Consultants
-
Chris Burk,Steve Salzer,General Contractor: El Dorado,PKMR Engineering,Structural Engineer: Genesis Structures,Civil Engineer: Genesis Structures,Derek Porter Studio,Boulevard Brewing Company,Mike Sinclair
- Project Status
- Built
Project Description
Industrial Projects
2012 Annual Design Review
El Dorado
Tucked between two busy traffic throughways in Kansas City, Mo., is the 100-year-old building that serves as the home for Boulevard Brewing Co., one of the area’s largest microbreweries. When it came time for the company’s operation to expand with eight new 40-foot-tall tanks for beer brewing, they turned to local firm El Dorado to fit the new equipment into an existing space, which was only 15 feet high. The resulting glass-and-perforated-aluminum-panel-clad vertical addition encloses the tanks, making them accessible for monitoring and for adding ingredients 24 hours a day, during all seasons.
In addition to providing shelter for the new brewing tanks, the structure—which is chamfered at its northern end in a nod to the path of an underground river on the site—serves as a light monitor, evacuates hot air from the rest of the facility through its roof, and allows natural daylight to permeate adjacent brewing spaces in the complex.
“You’re going to put in eight 40-foot vats. So what do you do? You put them on top of the roof and you make a hood ornament out of them. It calls attention to this gritty part of town.” —Carol Ross Barney
For the original article, please visit http://www.architectmagazine.com/industrial-projects/boulevard-brewing-company-cellar-1-expansion.aspx