Papua New Guinea Steel Structure Stadium Building(Under Construction)

Project Details

Project Name
Papua New Guinea Steel Structure Stadium Building(Under Construction)
Location
Western Highlands Province,Papua New GuineaWestern Highlands ProvincePAPUA NEW GUINEA
Shared By
Lion Qin
Project Status
On the Boards/In Progress
Year Completed
2020
Style
Modern
Team
iBeehive: Susan Zhang
Room or Space

Project Description

Our Papua New Guinea Arena project is mainly divided into three parts:
1, Stadium in Papua New Guinea–project 1(Main Stadium Building)
Including the following material:
*Main steel structure –Q355, prepainted with 75-micron epoxy
*Secondary steel structure–Q235, including the rafter, bracing, stairs, etc, prepainted with 75-micron epoxy
* Bolts

2, Stadium in Papua New Guinea–project 2(Kagua Stadium)
Including the following material:
*Main steel structure –Q355, prepainted with 75-micron epoxy
*Secondary steel structure–Q235, including the rafter, bracing, stairs, etc, prepainted with 75-micron epoxy
*Bolts

3, Stadium in Papua New Guinea–project 3(Mini Stadium)
Including the following material:
*Main steel structure –Q355, prepainted with 75-micron epoxy
*Secondary steel structure–Q235, including the rafter, bracing, stairs, etc, prepainted with 75-micron epoxy
*Bolts
*simple steel sheet:thickness=0.5mm, type=820
* Decking:thickness=1.0mm, type=720

Upcoming Events

  • AI for Architects and Engineers: A Crash Course in Our Agentic Future

    CEU Live Webinar

    Register for Free
  • Design and Planning Workflows with GIS

    Live Webinar

    Register Now
  • Future Place

    The Ritz-Carlton, Dallas Las Colinas Irving, TX

    Register Now
All Events