Feyenoord Training Complex

Project Details

Project Name
Feyenoord Training Complex
Project Types
Project Scope
New Construction
Shared By
Victoria Carodine
Project Status
Concept Proposal
Size
29,062 ft²
Team

Project Description

FROM THE ARCHITECTS:

The building will offer all sorts of facilities that are in line with the needs of a modern football club. A sizeable part of the complex has been reserved for sports-medical facilities and departments that focus on research and the players’ athletic performance. These activities will be supported by various offices, an auditorium, hospitality, lounge areas and of course the changing rooms for players and staff, including a number of wellness facilities. The grounds around the building will accommodate two football pitches and a separate keeper zone – all fitted with the latest analytical technology.

The basic design concept was to achieve as much transparency and interaction as possible between the fields and the building. The façade that faces the adjacent embankment has been designed as a screen, so that the building appears to turn its back to the public road. This creates optimal privacy for players and staff – allowing them to concentrate on their work and performance. The façade is a sharply delineated, single-form shell that doubles as a pronounced roof overhang projecting towards the fields to the south. This element is made up of trapezium-shaped, expanded weathering steel panels with varying degrees of perforation. The dynamic pattern created by this design is accentuated in a number of areas by starkly-designed window groups, found both in and behind the double façade. This combined façade-roof element serves as the building’s main landmark feature and represents Feyenoord’s unique identity. And its hue even calls the club’s distinctive colour – red – to mind.

The building has been embedded in its environs with an integrated design for the outdoor areas and various landscape elements that reinforce its architectural design and the unique Feyenoord atmosphere. Start of construction on the complex is scheduled for mid-2017.

Upcoming Events

  • NeoCon 2026

    The Mart, Chicago

    Register Now
  • AI for Architects and Engineers: A Crash Course in Our Agentic Future

    CEU Live Webinar

    Register for Free
  • Design and Planning Workflows with GIS

    Live Webinar

    Register Now
All Events