Project Details
- Project Name
- Miami Cruise Terminal
- Architect
- Broadway Malyan
- Client/Owner
- Royal Caribbean Cruises Ltd.
- Project Types
- Transportation
- Project Scope
- New Construction
- Size
- 200,000 sq. feet
- Shared by
- Broadway Malyan
- Project Status
- On the Boards/In Progress
- Style
- Modern
Project Description
The Miami Cruise Terminal willl create a new icon on the waterfront and serve the largest cruise ships in the world; there will be space on the dock for ships that are 1,300 feet long.
The Terminal has been nicknamed the ‘Crown of Miami’ because of its shape which evokes the points of the symbolic headgear when viewed from the water. From the eastern or western approaches the ‘M’ of Miami is communicated, and when viewing the terminal side-on a sense of waves rising or ships passing is revealed.
The proposals centre on making the most of the arrivals experience. The building profile has been designed to provide a dynamic addition to the port and clear views are prioritised via the inclusion of deliberate void space to ensure that passengers have the impact of seeing their cruise ship as soon as they approach the terminal.
At night the façade will be lit ensuring that the building makes an impression.
The design incorporates a number of sustainability focused enhancements to reduce its environmental impact including rainwater collection and recycling so that it can be used for cooling, toilet flushing and irrigation.
The design and materials have been chosen with efficiency and cost in mind. Using a simple prefabricated frame, prefabricated flooring panels, and a repetitive system, the core of the building can be constructed quickly.
Steel beams will form the shape of the building’s profile and the roof will be clad with waterproof aluminium.
The main glazing wall faces north to maximise views and energy efficiency. The south side of the scheme forms a car park with 1,000 spaces, loading bays, and passenger drop offs (including taxi and bus stops) at every level to keep traffic moving. Aluminium fins and spacing enable ventilation for the parking levels and M&E spaces below and the car park forms a buffer between the terminal building and the noise and views of the shipping port next to the site.
Subject to planning approval the terminal construction will begin Q1 in 2017 and is expected to be operational by Q4 2018.