Pitt River Middle School

Project Details

Project Name
Pitt River Middle School
Location
2070 Tyner StPort CoquitlamBritish ColumbiaCanada
Project Types
Project Status
Built
Year Completed
2014
Team
Lead Design Architect: Alex Minard, AIBC, MRAIC, LEED AP, BD+C

Project Description

FROM THE AIBC:

Pitt River Middle School begins each day as a quiet,
white box, clad in corrugated siding. As the day begins and the 5,580 SM school
for 450 students in grades 6-8 comes to life, bi-folding shutters that protect
the building at night from vandalism are opened to reveal the warmth of the
timber columns highlighted with brightly coloured panels. In their open
position the perforated shutters provide solar shading, and they can be lowered
to provide glare control as necessary. After dark, the rigid shutters transform
into a diaphanous curtain.

Upcoming Events

  • Future Place

    The Ritz-Carlton, Dallas Las Colinas Irving, TX

    Register Now
  • Dallas Dealmakers

    The Ritz-Carlton Dallas, Irving, TX

    Register Now
  • Denver Dealmakers

    Denver Marriott South at Park Meadows

    Register Now
All Events